Implementing a toolkit for the prevention, management and control of carbapenemase-producing Enterobacteriaceae in English acute hospitals trusts: a qualitative evaluation.

Implementing a toolkit for the prevention, management and control of carbapenemase-producing Enterobacteriaceae in English acute hospitals trusts: a qualitative evaluation.

Schneider, Annegret;Coope, Caroline;Michie, Susan;Puleston, Richard;Hopkins, Susan;Oliver, Isabel;
BMC health services research 2019 Vol. 19 pp. 689
317
schneider2019implementingbmc

Abstract

Antimicrobial resistance is an increasing problem in hospitals world-wide. Following other countries, English hospitals experienced outbreaks of carbapenemase-producing Enterobacteriaceae (CPE), a bacterial infection commonly resistant to last resort antibiotics. One way to improve CPE prevention, management and control is the production of guidelines, such as the CPE toolkit published by Public Health England in December 2013. The aim of this research was to investigate the implementation of the CPE toolkit and to identify barriers and facilitators to inform future policies.Acute hospital trusts (N = 12) were purposively sampled based on their self-assessed CPE colonisation rates and time point of introducing local CPE action plans. Following maximum variation sampling, 44 interviews with hospital staff were conducted between April and August 2017 using a semi-structured topic guide based on the Capability, Opportunity, Motivation and Behaviour Model and the Theoretical Domains Framework, covering areas of influences on behaviour. Interviews were audio-recorded, transcribed verbatim and analysed using thematic analysis.The national CPE toolkit was widely disseminated within infection prevention and control teams (IPCT), but awareness was rare among other hospital staff. Local plans, developed by IPCTs referring to the CPE toolkit while considering local circumstances, were in place in all hospitals. Implementation barriers included: shortage of isolation facilities for CPE patients, time pressures, and competing demands. Facilitators were within hospital and across-hospital collaborations and knowledge sharing, availability of dedicated IPCTs, leadership support and prioritisation of CPE as an important concern. Participants using the CPE toolkit had mixed views, appreciating its readability and clarity about patient management, but voicing concerns about the lack of transparency on the level of evidence and the practicality of implementation. They recommended regular updates, additional clarifications, tailored information and implementation guidance.There were problems with the awareness and implementation of the CPE toolkit and frontline staff saw room for improvement, identifying implementation barriers and facilitators. An updated CPE toolkit version should provide comprehensive and instructive guidance on evidence-based CPE prevention, management and control procedures and their implementation in a modular format with sections tailored to hospitals' CPE status and to different staff groups.

Citation

ID: 60760
Ref Key: schneider2019implementingbmc
Use this key to autocite in SciMatic or Thesis Manager

References

Blockchain Verification

Account:
NFT Contract Address:
0x95644003c57E6F55A65596E3D9Eac6813e3566dA
Article ID:
60760
Unique Identifier:
10.1186/s12913-019-4492-4
Network:
Scimatic Chain (ID: 481)
Loading...
Blockchain Readiness Checklist
Authors
Abstract
Journal Name
Year
Title
5/5
Creates 1,000,000 NFT tokens for this article
Token Features:
  • ERC-1155 Standard NFT
  • 1 Million Supply per Article
  • Transferable via MetaMask
  • Permanent Blockchain Record
Blockchain QR Code
Scan with Saymatik Web3.0 Wallet

Saymatik Web3.0 Wallet