Statistical Control of Time and Cost Performance Indices in Construction Projects: A Case Study

Statistical Control of Time and Cost Performance Indices in Construction Projects: A Case Study

Akbar, Ali Akbar;Salehipour, Amir;
muṭāli̒āt-i mudīriyyat-i Ṣan̒atī 2013 Vol. 10 pp. 144-166
372
akbar2013statisticalmuliti

Abstract

The earned value management is a powerful and important technique in analyzing and controlling the project performance. While it allows exact measurement of project progress, it lets corrective actions in a timely manner. In fact, the earned value allows project managers to find out any project time and cost deviations by calculating the performance indices. In this paper, to improve the applicability of the traditional earned value technique, we develop an integrated approach by combining statistical quality control charts with traditional earned value technique, to monitor and control project time and cost performances. The results applied to a real construction project compete favorly against traditional approaches

Citation

ID: 50170
Ref Key: akbar2013statisticalmuliti
Use this key to autocite in SciMatic or Thesis Manager

References

Blockchain Verification

Account:
NFT Contract Address:
0x95644003c57E6F55A65596E3D9Eac6813e3566dA
Article ID:
50170
Unique Identifier:
605a6bd5c047eba7a39d0f36e2adce50
Network:
Scimatic Chain (ID: 481)
Loading...
Blockchain Readiness Checklist
Authors
Abstract
Journal Name
Year
Title
5/5
Creates 1,000,000 NFT tokens for this article
Token Features:
  • ERC-1155 Standard NFT
  • 1 Million Supply per Article
  • Transferable via MetaMask
  • Permanent Blockchain Record
Blockchain QR Code
Scan with Saymatik Web3.0 Wallet

Saymatik Web3.0 Wallet