Mineral processing simulation based-environmental life cycle assessment for rare earth project development: A case study on the Songwe Hill project.

Mineral processing simulation based-environmental life cycle assessment for rare earth project development: A case study on the Songwe Hill project.

Pell, Robert;Wall, Frances;Yan, Xiaoyu;Li, Jinhui;Zeng, Xianlai;
Journal of environmental management 2019 Vol. 249 pp. 109353
190
pell2019mineraljournal

Abstract

Rare earth elements (REE), including neodymium, praseodymium, and dysprosium are used in a range of low-carbon technologies, such as electric vehicles and wind turbines, and demand for these REE is forecast to grow. This study demonstrates that a process simulation-based life cycle assessment (LCA) carried out at the early stages of a REE project, such as at the pre-feasibility stage, can inform subsequent decision making during the development of the project and help reduce its environmental impacts. As new REE supply chains are established and new mines are opened. It is important that the environmental consequences of different production options are examined in a life cycle context in order that the environment footprint of these raw materials is kept as low as possible. Here, we present a cradle-to-gate and process simulation-based life cycle assessment (LCA) for a potential new supply of REE at Songwe Hill in Malawi. We examine different project options including energy selection and a comparison of on-site acid regeneration versus virgin acid consumption which were being considered for the project. The LCA results show that the global warming potential of producing 1 kg of rare earth oxide (REO) from Songwe Hill is between 17 and 87 kg CO-eq. A scenario that combines on-site acid regeneration with off-peak hydroelectric and photovoltaic energy gives the lowest global warming potential and performs well in other impact categories. This approach can equally well be applied to all other types of ore deposits and should be considered as a routine addition to all pre-feasibility studies.

Citation

ID: 42105
Ref Key: pell2019mineraljournal
Use this key to autocite in SciMatic or Thesis Manager

References

Blockchain Verification

Account:
NFT Contract Address:
0x95644003c57E6F55A65596E3D9Eac6813e3566dA
Article ID:
42105
Unique Identifier:
S0301-4797(19)31062-X
Network:
Scimatic Chain (ID: 481)
Loading...
Blockchain Readiness Checklist
Authors
Abstract
Journal Name
Year
Title
5/5
Creates 1,000,000 NFT tokens for this article
Token Features:
  • ERC-1155 Standard NFT
  • 1 Million Supply per Article
  • Transferable via MetaMask
  • Permanent Blockchain Record
Blockchain QR Code
Scan with Saymatik Web3.0 Wallet

Saymatik Web3.0 Wallet