batch scheduling on two-machine flowshop with machine-dependent setup times
;Lika Ben-Dati;Gur Mosheiov;Daniel Oron
International journal of dentistry2009Vol. 2009pp. -
129
ben-dati2009advancesbatch
Abstract
We study a batch scheduling problem on a 2-machine flowshop. We assume unit processing time jobs, batch availability, and machine-dependent setup times. The objective is to find a job allocation to batches of integer size and a batch schedule that minimize makespan. We introduce a very efficient closed form solution for the problem.