Abstract

Design and build is a popular form of procurement worldwide. In its conventional form, it is characterised by the integration between design and construction. Novation, a variant of design and build where design responsibility is transferred from designer to contractor as procurement evolves, has gained in popularity. However, the characteristics of the process, although well identified, continue to create confusion and problems for clients and contractors alike. This paper focuses on the dynamics of design and build novation from the principal contractor's and architect's perspectives. It embraces key aspects of both the pre-contract and post-contract environment. Its contribution forms a part of a major UK Government funded research project investigating design and build best practice. The findings presented in this paper broadly indicate that contractors believe novated design and build can be disadvantageous and that considerable fragmentation can be created in what should be an integrated procurement approach.

Citation

ID: 246451
Ref Key: griffith2012australasianexamining
Use this key to autocite in SciMatic or Thesis Manager

References

Blockchain Verification

Account:
NFT Contract Address:
0x95644003c57E6F55A65596E3D9Eac6813e3566dA
Article ID:
246451
Unique Identifier:
10.5130/ajceb.v3i1.2907
Network:
Scimatic Chain (ID: 481)
Loading...
Blockchain Readiness Checklist
Authors
Abstract
Journal Name
Year
Title
5/5
Creates 1,000,000 NFT tokens for this article
Token Features:
  • ERC-1155 Standard NFT
  • 1 Million Supply per Article
  • Transferable via MetaMask
  • Permanent Blockchain Record
Blockchain QR Code
Scan with Saymatik Web3.0 Wallet

Saymatik Web3.0 Wallet