Analysis of construction dynamic plan using fuzzy critical path method

Analysis of construction dynamic plan using fuzzy critical path method

V., Kurij Kazimir;V., Milajić Aleksandar;D., Beljaković Dejan;
tehnika 2014 Vol. 69 pp. 209-215
156
v2014analysistehnika

Abstract

Critical Path Method (CPM) technique has become widely recognized as valuable tool for the planning and scheduling large construction projects. The aim of this paper is to present an analytical method for finding the Critical Path in the precedence network diagram where the duration of each activity is represented by a trapezoidal fuzzy number. This Fuzzy Critical Path Method (FCPM) uses a defuzzification formula for trapezoidal fuzzy number and applies it on the total float (slack time) for each activity in the fuzzy precedence network to find the critical path. The method presented in this paper is very effective in determining the critical activities and finding the critical paths.

Citation

ID: 24181
Ref Key: v2014analysistehnika
Use this key to autocite in SciMatic or Thesis Manager

References

Blockchain Verification

Account:
NFT Contract Address:
0x95644003c57E6F55A65596E3D9Eac6813e3566dA
Article ID:
24181
Unique Identifier:
Network:
Scimatic Chain (ID: 481)
Loading...
Blockchain Readiness Checklist
Authors
Abstract
Journal Name
Year
Title
5/5
Creates 1,000,000 NFT tokens for this article
Token Features:
  • ERC-1155 Standard NFT
  • 1 Million Supply per Article
  • Transferable via MetaMask
  • Permanent Blockchain Record
Blockchain QR Code
Scan with Saymatik Web3.0 Wallet

Saymatik Web3.0 Wallet