benefits and economic costs of managed aquifer recharge in california

benefits and economic costs of managed aquifer recharge in california

;Debra Perrone;Melissa Merri Rohde
applied mathematics and computation 2016 Vol. 14 pp. -
197
perrone2016sanbenefits

Abstract

doi: http://dx.doi.org/10.15447/sfews.2016v14iss2art4

Groundwater management is important and challenging, and nowhere is this more evident than in California. Managed aquifer recharge (MAR) projects can play an important role in ensuring California manages its groundwater sustainably. Although the benefits and economic costs of surface water storage have been researched extensively, the benefits and economic costs of MAR have been little researched. Historical groundwater data are sparse or proprietary within the state, often impairing groundwater analyses. General obligation bonds from ballot propositions offer a strategic means of mining information about MAR projects, because the information is available publicly. We used bond-funding applications to identify anticipated MAR project benefits and proposed economic costs. We then compared these costs with actual project costs collected from a survey, and identified factors that promote or limit MAR. Our analysis indicates that the median proposed economic cost for MAR projects in California is $410 per acre-foot per year ($0.33 per cubic meter per year). Increasing Water Supply, Conjunctive Use, and Flood Protection are the most common benefits reported. Additionally, the survey indicates that (1) there are many reported reasons for differences between proposed and actual costs ($US 2015) and (2) there is one primary reason for differences between proposed recharge volumes and actual recharge volumes (AFY): availability of source water for recharge. Although there are differences between proposed and actual costs per recharge volume ($US 2015/AFY), the ranges for proposed costs per recharge volume and actual costs per recharge volume for the projects surveyed generally agree. The two most important contributions to the success of a MAR project are financial support and good communication with stakeholders.

Citation

ID: 208570
Ref Key: perrone2016sanbenefits
Use this key to autocite in SciMatic or Thesis Manager

References

Blockchain Verification

Account:
NFT Contract Address:
0x95644003c57E6F55A65596E3D9Eac6813e3566dA
Article ID:
208570
Unique Identifier:
Network:
Scimatic Chain (ID: 481)
Loading...
Blockchain Readiness Checklist
Authors
Abstract
Journal Name
Year
Title
5/5
Creates 1,000,000 NFT tokens for this article
Token Features:
  • ERC-1155 Standard NFT
  • 1 Million Supply per Article
  • Transferable via MetaMask
  • Permanent Blockchain Record
Blockchain QR Code
Scan with Saymatik Web3.0 Wallet

Saymatik Web3.0 Wallet