management of construction time at the restoration of the ostankino tv tower

management of construction time at the restoration of the ostankino tv tower

;Михаил Николаевич ЕРШОВ;Александр Иванович МЕНЕЙЛЮК;Лилия Вячеславовна ЛОБАКОВА
journal of wind engineering and industrial aerodynamics 2015 Vol. 4 pp. 96-101
237
2015vsnikmanagement

Abstract

The article presents options for managing construction time at restoration and renovation of the "Ostankino television tower", Moscow, also provides variants of method for optimization construction and installation works. Methodology is based on the construction of the project models in Microsoft Project and their experimental and statistical analysis using software COMPEX. This method is effective in the optimization reconstruction of complex engineering structures.

Citation

ID: 180051
Ref Key: 2015vsnikmanagement
Use this key to autocite in SciMatic or Thesis Manager

References

Blockchain Verification

Account:
NFT Contract Address:
0x95644003c57E6F55A65596E3D9Eac6813e3566dA
Article ID:
180051
Unique Identifier:
10.20998/2413-3000.2015.1111.18
Network:
Scimatic Chain (ID: 481)
Loading...
Blockchain Readiness Checklist
Authors
Abstract
Journal Name
Year
Title
5/5
Creates 1,000,000 NFT tokens for this article
Token Features:
  • ERC-1155 Standard NFT
  • 1 Million Supply per Article
  • Transferable via MetaMask
  • Permanent Blockchain Record
Blockchain QR Code
Scan with Saymatik Web3.0 Wallet

Saymatik Web3.0 Wallet