a segmented signal progression model for the modern streetcar system

a segmented signal progression model for the modern streetcar system

;Baojie Wang;Wei Wang;Xiaojian Hu;Xiaowei Li
Journal of the American Heart Association 2015 Vol. 2015 pp. -
55
wang2015discretea

Abstract

This paper is on the purpose of developing a segmented signal progression model for modern streetcar system. The new method is presented with the following features: (1) the control concept is based on the assumption of only one streetcar line operating along an arterial under a constant headway and no bandwidth demand for streetcar system signal progression; (2) the control unit is defined as a coordinated intersection group associated with several streetcar stations, and the control joints must be streetcar stations; (3) the objective function is built to ensure the two-way streetcar arrival times distributing within the available time of streetcar phase; (4) the available time of streetcar phase is determined by timing schemes, intersection structures, track locations, streetcar speeds, and vehicular accelerations; (5) the streetcar running speed is constant separately whether it is in upstream or downstream route; (6) the streetcar dwell time is preset according to historical data distribution or charging demand. The proposed method is experimentally examined in Hexi New City Streetcar Project in Nanjing, China. In the experimental results, the streetcar system operation and the progression impacts are shown to affect transit and vehicular traffic. The proposed model presents promising outcomes through the design of streetcar system segmented signal progression, in terms of ensuring high streetcar system efficiency and minimizing negative impacts on transit and vehicular traffic.

Keywords

Citation

ID: 146249
Ref Key: wang2015discretea
Use this key to autocite in SciMatic or Thesis Manager

References

Blockchain Verification

Account:
NFT Contract Address:
0x95644003c57E6F55A65596E3D9Eac6813e3566dA
Article ID:
146249
Unique Identifier:
10.1155/2015/763565
Network:
Scimatic Chain (ID: 481)
Loading...
Blockchain Readiness Checklist
Authors
Abstract
Journal Name
Year
Title
5/5
Creates 1,000,000 NFT tokens for this article
Token Features:
  • ERC-1155 Standard NFT
  • 1 Million Supply per Article
  • Transferable via MetaMask
  • Permanent Blockchain Record
Blockchain QR Code
Scan with Saymatik Web3.0 Wallet

Saymatik Web3.0 Wallet