Validation and Determination of Level of Social Acceptability of Hydroelectric Power Plant Project of Hedcor Inc. in La Trinidad, Benguet

582 reads
Psych Educ Multidisc J, 2023, 7 (10), 824-840, doi: 10.5281/zenodo.7760428, ISSN 2822-4353

Abstract

The main factor in the success of a particular hydroelectric power plant industry is its social acceptance from the host communities like the Indigenous Cultural Communities/Indigenous Peoples, landowners, barangay, municipal, and the province. However, to be socially acceptable in the conduct of getting the social license to operate, these host communities shall be satisfied. The study determined the level of social acceptability and satisfaction by the ICCs/IPs, Host Communities, and Local Government Units (LGUs) to the hydroelectric power plant project of Hedcor, Inc. in La Trinidad, Benguet. Based on the findings, the level of social acceptance of La Trinidad ICCs/IPs, landowners and host communities (Barangay, Municipal, and Province) to Hedcor Hydro Project is very high acceptance when values and interest, engagement and participation, trust and confidence, information, and contextual are met and that the community will renew for another contract and give their consent for a new hydro project of Hedcor because of very high acceptance. Thus, the satisfaction of the Host Communities is very important in acquiring the consent of the Host Communities and the benefits to be shared from the power plant. Moreover, it is essential that the benefits taken from the project by the community are of equal value for the utilization of Hedcor to the natural resources of the host community.

Keywords: stakeholder engagement, Social acceptability, social satisfaction, hydro developer, host community
Default avatar

Blockchain Confirmation

Loading...
If you want to upload this article to SciMatic Hybrid Blockchain, install MetaMask extension to your web browser, create a wallet and buy SCI coins at SciMatic using credit or contact your country coordinator.
One article costs 10 SCI coins to be in the Blockchain. Buy SCI Coins

Bibliographic Information

Bobby Atayan (2023). Validation and Determination of Level of Social Acceptability of Hydroelectric Power Plant Project of Hedcor Inc. in La Trinidad, Benguet, Psychology and Education: A Multidisciplinary Journal, 7(10): 824-840
Bibtex Citation
@article{bobby_atayan2023pemj,
author = {Bobby Atayan},
title = {Validation and Determination of Level of Social Acceptability of Hydroelectric Power Plant Project of Hedcor Inc. in La Trinidad, Benguet},
journal = {Psychology and Education: A Multidisciplinary Journal},
year = {2023},
volume = {7},
number = {10},
pages = {824-840},
doi = {10.5281/zenodo.7760428},
url = {https://scimatic.org/index.php/show_manuscript/1120}
}
APA Citation
Atayan, B., (2023). Validation and Determination of Level of Social Acceptability of Hydroelectric Power Plant Project of Hedcor Inc. in La Trinidad, Benguet. Psychology and Education: A Multidisciplinary Journal, 7(10), 824-840. https://doi.org/10.5281/zenodo.7760428

Author Information

  • To change your profile photo, login to scimatic.org, go to your profile and change the photo.
  • Provide a face photo, and not full body.
  • It is better to remove the background from your photo. Go to Remove Background and then upload to profile
  • If you are unable to login, go to Reset My Password provide your email registered with the article and get new password.
  • In case of any other problem, contact your editor directly or write to us at info @ scimatic.org