Cite This Article

Validation and Determination of Level of Social Acceptability of Hydroelectric Power Plant Project of Hedcor Inc. in La Trinidad, Benguet
Bobby Atayan — Psychology and Education: A Multidisciplinary Journal (2023)
Back to Article
APA APA 7th
Atayan, B. (2023). Validation and Determination of Level of Social Acceptability of Hydroelectric Power Plant Project of Hedcor Inc. in La Trinidad, Benguet. Psychology and Education: A Multidisciplinary Journal, 7(10), 824-840. https://doi.org/10.5281/zenodo.7760428
MLA MLA 9th
Atayan, Bobby. "Validation and Determination of Level of Social Acceptability of Hydroelectric Power Plant Project of Hedcor Inc. in La Trinidad, Benguet." Psychology and Education: A Multidisciplinary Journal, vol. 7, no. 10, 2023, pp. 824-840. DOI: 10.5281/zenodo.7760428.
CHI Chicago
Atayan, Bobby. "Validation and Determination of Level of Social Acceptability of Hydroelectric Power Plant Project of Hedcor Inc. in La Trinidad, Benguet." Psychology and Education: A Multidisciplinary Journal 7, no. 10 (2023): 824-840. https://doi.org/10.5281/zenodo.7760428.
HAR Harvard
Atayan, B. (2023) 'Validation and Determination of Level of Social Acceptability of Hydroelectric Power Plant Project of Hedcor Inc. in La Trinidad, Benguet', Psychology and Education: A Multidisciplinary Journal, 7(10), pp. 824-840. doi: 10.5281/zenodo.7760428.
IEEE IEEE
B. Atayan, "Validation and Determination of Level of Social Acceptability of Hydroelectric Power Plant Project of Hedcor Inc. in La Trinidad, Benguet," Psychology and Education: A Multidisciplinary Journal, vol. 7, no. 10, pp. 824-840, 2023. doi: 10.5281/zenodo.7760428.
VAN Vancouver
Atayan B. Validation and Determination of Level of Social Acceptability of Hydroelectric Power Plant Project of Hedcor Inc. in La Trinidad, Benguet. Psychology and Education: A Multidisciplinary Journal. 2023;7(10):824-840. doi: 10.5281/zenodo.7760428.
BIB BibTeX
@article{bobby2023,
  title     = {Validation and Determination of Level of Social Acceptability of Hydroelectric Power Plant Project of Hedcor Inc. in La Trinidad, Benguet},
  author    = {Bobby Atayan},
  journal   = {Psychology and Education: A Multidisciplinary Journal},
  volume    = {7},
  number    = {10},
  pages     = {824-840},
  year      = {2023},
  doi       = {10.5281/zenodo.7760428},
}