the dynamics of flooding in the volga-akhtuba floodplain because of the volzhsky hydroelectric dam break on the basis of the hydrodynamic modeling

the dynamics of flooding in the volga-akhtuba floodplain because of the volzhsky hydroelectric dam break on the basis of the hydrodynamic modeling

;T. A. Dyakonova;E. A. Agafonnikova;A. V. Khoperskov;S. S. Khrapov
Frontiers in genetics 2014 Vol. 20 pp. 264-273
162
dyakonova2014intercarto.the

Abstract

The potential problem Volzhsky hydroelectric dam break is considered. A numerical model based on cSPH-TVD method using parallel technology was build. Numerical calculations are carried for the dynamics of development and consequences of flooding in the Volga-Akhtuba floodplain.

Citation

ID: 257144
Ref Key: dyakonova2014intercarto.the
Use this key to autocite in SciMatic or Thesis Manager

References

Blockchain Verification

Account:
NFT Contract Address:
0x95644003c57E6F55A65596E3D9Eac6813e3566dA
Article ID:
257144
Unique Identifier:
10.24057/2414-9179-2014-1-20-264-273
Network:
Scimatic Chain (ID: 481)
Loading...
Blockchain Readiness Checklist
Authors
Abstract
Journal Name
Year
Title
5/5
Creates 1,000,000 NFT tokens for this article
Token Features:
  • ERC-1155 Standard NFT
  • 1 Million Supply per Article
  • Transferable via MetaMask
  • Permanent Blockchain Record
Blockchain QR Code
Scan with Saymatik Web3.0 Wallet

Saymatik Web3.0 Wallet