requirements of modernization assessment and maintenance of the north channel of obra

requirements of modernization assessment and maintenance of the north channel of obra

;Paweł Kozaczyk;Piotr Stachowski;Daniel Liberacki
BMC medical education 2015 Vol. 43 pp. 139-145
189
kozaczyk2015inynieriarequirements

Abstract

In an attempt to assess the needs of the modernization of the North Channel of Obra, the construction began in 1852. The condition of drainage occurring on this course coming generally from the early 20th century and is unsatisfactory. This is the result of longstanding neglect and lack of maintenance. The first modernization works started in 1986. Undergoing on the North Channel of Obra are primarily made in the framework of four tasks, which was the regulation of the water course on a length of approximately 35 km 8 dams were built and 9 dams were demolished. The cost of upgrading the North Channel of The Obra was significantly different, what is the result of the works. They include the cost of reconstruction of the drainage channels, and the reconstruction of hydraulic structures. At this work, in addition to the needs assessment of the North Channel of Obra, further modernization needs were indicated.

Citation

ID: 235412
Ref Key: kozaczyk2015inynieriarequirements
Use this key to autocite in SciMatic or Thesis Manager

References

Blockchain Verification

Account:
NFT Contract Address:
0x95644003c57E6F55A65596E3D9Eac6813e3566dA
Article ID:
235412
Unique Identifier:
10.12912/23920629/58915
Network:
Scimatic Chain (ID: 481)
Loading...
Blockchain Readiness Checklist
Authors
Abstract
Journal Name
Year
Title
5/5
Creates 1,000,000 NFT tokens for this article
Token Features:
  • ERC-1155 Standard NFT
  • 1 Million Supply per Article
  • Transferable via MetaMask
  • Permanent Blockchain Record
Blockchain QR Code
Scan with Saymatik Web3.0 Wallet

Saymatik Web3.0 Wallet