timing of efficient snow clearance for summer operation at syowa station

timing of efficient snow clearance for summer operation at syowa station

;Kenji Ishizawa
revista facultad nacional de agronomía medellín 2018 Vol. 62 pp. 1-14
221
ishizawa2018antarctictiming

Abstract

Some construction and outworks are conducted at Syowa Station during the period between the middle of December and middle of February every season. Before the outworks, main roads for cargo transportation and new outwork sites need to be cleared of snow by the wintering members. The clearance work of snow is carried out depending on the respective plans by each wintering parties because there are not any manuals referring to the timing of the operation and the method. Therefore, some clearance works were not efficient because they started the work too early without plenty of solar radiation or they suffered from blizzards after completing the snow removal. To work out the best moment of the operation, meteorological data such as air temperature, snow depth, solar radiation and blizzard over previous years at Syowa Station were analyzed. As a result, it was found that the snow-removal operation including treatment of snow melting agent should start from the middle of November.

Citation

ID: 224070
Ref Key: ishizawa2018antarctictiming
Use this key to autocite in SciMatic or Thesis Manager

References

Blockchain Verification

Account:
NFT Contract Address:
0x95644003c57E6F55A65596E3D9Eac6813e3566dA
Article ID:
224070
Unique Identifier:
10.15094/00014896
Network:
Scimatic Chain (ID: 481)
Loading...
Blockchain Readiness Checklist
Authors
Abstract
Journal Name
Year
Title
5/5
Creates 1,000,000 NFT tokens for this article
Token Features:
  • ERC-1155 Standard NFT
  • 1 Million Supply per Article
  • Transferable via MetaMask
  • Permanent Blockchain Record
Blockchain QR Code
Scan with Saymatik Web3.0 Wallet

Saymatik Web3.0 Wallet