small scale hydroelectric power plants in norway. some microeconomic and environmental considerations

small scale hydroelectric power plants in norway. some microeconomic and environmental considerations

;Johannes Idsø
journal of physics: conference series 2017 Vol. 9 pp. 1117-
160
ids2017sustainabilitysmall

Abstract

The development of small-scale hydroelectric power plants in Norway is determined by natural conditions, policies, attitudes and property rights. The owner of the river is the central decision maker. It is he/she who decides whether he/she will develop the power plant himself/herself, whether he/he wants to enter into a contract with an external investor and let him/her develop the power plant, whether he/she will sell his/her property rights or postpone the decisions. All available choices will involve risk. In order for him/her to make the best choice, he/she must find the certainty equivalent to each of the choices and choose the one with the highest certainty equivalent. To find the certainty equivalent, we use the utility theory of John von Neumann and Oskar Morgenstern. The owner of the river makes the decision that gives him/her the greatest utility when both economic and non-economic effects are assessed within the opportunity set made by the local and the central authorities.

Citation

ID: 168853
Ref Key: ids2017sustainabilitysmall
Use this key to autocite in SciMatic or Thesis Manager

References

Blockchain Verification

Account:
NFT Contract Address:
0x95644003c57E6F55A65596E3D9Eac6813e3566dA
Article ID:
168853
Unique Identifier:
10.3390/su9071117
Network:
Scimatic Chain (ID: 481)
Loading...
Blockchain Readiness Checklist
Authors
Abstract
Journal Name
Year
Title
5/5
Creates 1,000,000 NFT tokens for this article
Token Features:
  • ERC-1155 Standard NFT
  • 1 Million Supply per Article
  • Transferable via MetaMask
  • Permanent Blockchain Record
Blockchain QR Code
Scan with Saymatik Web3.0 Wallet

Saymatik Web3.0 Wallet