ecological-economic feasibility of use of materials of secondary processing in housing sector within the program of renovation

ecological-economic feasibility of use of materials of secondary processing in housing sector within the program of renovation

;E. Zimin
breathe (sheffield, england) 2019 pp. 22-27
230
zimin2019ecological-economic

Abstract

In the present article we show the necessity and possibilities of the recycling of construction materials used in the sphere of housing and public utilities. Large-scale programme of housing renovation taking place in Moscow is going to leave behind a lot of construction waste. The article presents the ways of dealing with the demolition waste, such innovative types of its utilization as recycling, regeneration and recovery are described along with the ways of secondary materials’ usage.

Citation

ID: 160435
Ref Key: zimin2019ecological-economic
Use this key to autocite in SciMatic or Thesis Manager

References

Blockchain Verification

Account:
NFT Contract Address:
0x95644003c57E6F55A65596E3D9Eac6813e3566dA
Article ID:
160435
Unique Identifier:
Network:
Scimatic Chain (ID: 481)
Loading...
Blockchain Readiness Checklist
Authors
Abstract
Journal Name
Year
Title
5/5
Creates 1,000,000 NFT tokens for this article
Token Features:
  • ERC-1155 Standard NFT
  • 1 Million Supply per Article
  • Transferable via MetaMask
  • Permanent Blockchain Record
Blockchain QR Code
Scan with Saymatik Web3.0 Wallet

Saymatik Web3.0 Wallet