Cost And Time Optimization In Construction: Performance Analysis Of Earthworks And Retaining Walls

Mohamed Izedin Mohamed, Jelissa Flores
Journal of Advanced Studies in Tourism, Hospitality, and Management · 2026-03-27 · DOI 10.70838/jasthm.010205
Token #7471
✓ Verified on SciChain. The record below hashes to exactly the content hash stored on chain for token #7471.
Token#7471 of SciMatic Articles (ERC-1155), fixed supply 1,000,000
Contract0x0E596B4bb924937aA35D9b342A90347ed6F05eF8
Mint transaction0x22c8ebe6bdb6acec1c55c0132700da8369b00845fb4338e35f8af197c9dfd300 · block 12110198
Minted2026-10-02 11:45 UTC
Hash on chain0x496ce5415bede28872f467ffd326e8947a5a7e06e522f35dbd4154b11b324985
SHA-256 of the record0x496ce5415bede28872f467ffd326e8947a5a7e06e522f35dbd4154b11b324985
Article today Matches the anchored record.

Allocation at minting

HolderWalletMintedHolds now
SciMatic (10%) 0xc35709AB…277732 100,000 100,000
Mohamed Izedin Mohamed 0x4deD53f8…f550bd 450,000 450,000
Jelissa Flores 0x4530037E…866fBE 450,000 450,000

The anchored record

Canonical JSON (keys sorted, no spaces, UTF-8). Its SHA-256 is the hash on chain.

{"abstract":"This study investigates cost and time optimization practices in earthworks and retaining wall projects within Saudi Arabia’s construction sector, a critical driver of national socio-economic development. Using a descriptive correlational design, data were synthesized from structured questionnaires administered to 20 construction professionals, including engineers and project managers, alongside site observations and project record reviews. The research evaluated how project planning, budgeting, and construction technology relate to overall performance. Findings, measured on a 5-point Likert scale, identified inefficient equipment utilization (Mean = 4.15), unforeseen site conditions (Mean = 4.0), poor stakeholder coordination (Mean = 4.0), and rework due to errors (Mean = 4.0) as the primary drivers of delays and overruns. Statistical analysis using Pearson’s correlation coefficient revealed weak negative relationships between the identified challenge categories and project performance, with budgeting and cost estimation emerging as the most significant predictors of performance variance (p < 0.05). These results suggest that while technical construction methods are foundational, financial accuracy and adaptive planning are the most critical levers for optimization. This study contributes to the field by providing Saudi Arabian practitioners with a data-driven framework for improving resource utilization and quality management, ultimately advocating for holistic coordination to mitigate the moderate but persistent negative effects of planning and financial inaccuracies on project success.","abstract_source":"original","authors":["Mohamed Izedin Mohamed","Jelissa Flores"],"date":"2026-03-27","doi":"10.70838/jasthm.010205","id":7471,"issue":2,"journal":{"issn":"3061-9785","name":"Journal of Advanced Studies in Tourism, Hospitality, and Management"},"pdf_sha256":"c563a6e1dcd626c3b4511b72de8417f65730e57b85f9c296f0f82b2d7b0c02e7","schema":"scimatic-article/1","title":"Cost And Time Optimization In Construction: Performance Analysis Of Earthworks And Retaining Walls","volume":1}

Check it yourself

1. The record, from the token's own metadata:

printf '%s' "$(curl -s https://scimatic.org/nft/articles/7471.json | jq -r .canonical_record)" | sha256sum

2. The hash stored on chain (contentHash(7471)):

curl -s https://rpc.scimatic.net -H 'content-type: application/json' \
  -d '{"jsonrpc":"2.0","id":1,"method":"eth_call","params":[{"to":"0x0E596B4bb924937aA35D9b342A90347ed6F05eF8","data":"0xf3e0c2900000000000000000000000000000000000000000000000000000000000001d2f"},"latest"]}'

The two must be equal (the second with a 0x in front).