← Back to the article

SciMatic · SciChain record

Evaluating DOLE Integrated Livelihood Program Implementation in South Cotabato: Basis for Monitoring and Feedback Program

Louie Esparagoza, Sonia Pimentel
Psychology and Education: A Multidisciplinary Journal · 2025-12-26 · DOI 10.70838/pemj.510106
Token #6981
✓ Verified on SciChain. The record below hashes to exactly the content hash stored on chain for token #6981.
Token#6981 of SciMatic Articles (ERC-1155), fixed supply 1,000,000
Contract0x0E596B4bb924937aA35D9b342A90347ed6F05eF8
Mint transaction0x7650040a5845d2e42f1512a85882c7879e4eb0b2f24a0da0c9977c93b8cb684b · block 12109323
Minted2026-10-02 10:32 UTC
Hash on chain0x2ccb720a11ea22368d2976c8fcf01775726fb4717e3880b88d7be52d7feca397
SHA-256 of the record0x2ccb720a11ea22368d2976c8fcf01775726fb4717e3880b88d7be52d7feca397
Article today Matches the anchored record.

Allocation at minting

HolderWalletMintedHolds now
SciMatic (10%) 0xc35709AB…277732 100,000 100,000
Louie Esparagoza 0xC975F9AD…cdF9dd 450,000 450,000
Sonia Pimentel 0x80FFc38D…daf7Bd 450,000 450,000

The anchored record

Canonical JSON (keys sorted, no spaces, UTF-8). Its SHA-256 is the hash on chain.

{"abstract":"This study examined how the Department of Labor and Employment’s Integrated Livelihood Program (DILP) is being implemented in South Cotabato, to provide recommendations for an effective monitoring and feedback plan. Using a qualitative descriptive approach, the review drew on DOLE’s available accomplishment reports and interviews with key program actors and beneficiaries to understand how the program operates on the ground. Findings show that while DOLE has been consistent in delivering livelihood assistance, several constraints continue to hinder smooth implementation. Limited personnel, weak institutional capacity, and the absence of a regular monitoring and evaluation system were identified as major bottlenecks. Challenges in procurement and disruptions from the COVID-19 pandemic further slowed program processes. Despite these issues, the study highlights that active stakeholder participation remains crucial for ensuring transparency, accountability, and sustained support for livelihood projects. Overall, the assessment emphasizes the need to strengthen staff capacity, clarify roles during implementation, and institutionalize continuous monitoring and impact evaluation. These improvements can help DILP become more responsive to local needs and better contribute to its broader goals of inclusive growth and poverty reduction, particularly for vulnerable communities.","abstract_source":"original","authors":["Louie Esparagoza","Sonia Pimentel"],"date":"2025-12-26","doi":"10.70838/pemj.510106","id":6981,"issue":1,"journal":{"issn":"2822-4353","name":"Psychology and Education: A Multidisciplinary Journal"},"pdf_sha256":"d3ccb3e7d5c38fd1ffef1c45f14625d7865e0cf9c3dc5bce085bb7e1faffba62","schema":"scimatic-article/1","title":"Evaluating DOLE Integrated Livelihood Program Implementation in South Cotabato: Basis for Monitoring and Feedback Program","volume":51}

Check it yourself

1. The record, from the token's own metadata:

printf '%s' "$(curl -s https://scimatic.org/nft/articles/6981.json | jq -r .canonical_record)" | sha256sum

2. The hash stored on chain (contentHash(6981)):

curl -s https://rpc.scimatic.net -H 'content-type: application/json' \
  -d '{"jsonrpc":"2.0","id":1,"method":"eth_call","params":[{"to":"0x0E596B4bb924937aA35D9b342A90347ed6F05eF8","data":"0xf3e0c2900000000000000000000000000000000000000000000000000000000000001b45"},"latest"]}'

The two must be equal (the second with a 0x in front).