Validation and Determination of Level of Social Acceptability of Hydroelectric Power Plant Project of Hedcor Inc. in La Trinidad, Benguet

Bobby Atayan
Psychology and Education: A Multidisciplinary Journal · 2023-03-22 · DOI 10.5281/zenodo.7760428
Token #1120
✓ Verified on SciChain. The record below hashes to exactly the content hash stored on chain for token #1120.
Token#1120 of SciMatic Articles (ERC-1155), fixed supply 1,000,000
Contract0x0E596B4bb924937aA35D9b342A90347ed6F05eF8
Mint transaction0x422d0df6f1a922731b9a166a997958619d1a8e4ef1f12348e0859929ba1267f2 · block 12096957
Minted2026-10-01 17:22 UTC
Hash on chain0xbd46ae8c97eec6141405d9eb78def0cec390b130c30d4b7908435b627657de00
SHA-256 of the record0xbd46ae8c97eec6141405d9eb78def0cec390b130c30d4b7908435b627657de00
Article today Matches the anchored record.

Allocation at minting

HolderWalletMintedHolds now
SciMatic (10%) 0xc35709AB…277732 100,000 100,000
Bobby Atayan 0x17094336…F0edc9 900,000 900,000

The anchored record

Canonical JSON (keys sorted, no spaces, UTF-8). Its SHA-256 is the hash on chain.

{"abstract":"The main factor in the success of a particular hydroelectric power plant industry is its social acceptance from the host communities like the Indigenous Cultural Communities/Indigenous Peoples, landowners, barangay, municipal, and the province. However, to be socially acceptable in the conduct of getting the social license to operate, these host communities shall be satisfied. The study determined the level of social acceptability and satisfaction by the ICCs/IPs, Host Communities, and Local Government Units (LGUs) to the hydroelectric power plant project of Hedcor, Inc. in La Trinidad, Benguet. Based on the findings, the level of social acceptance of La Trinidad ICCs/IPs, landowners and host communities (Barangay, Municipal, and Province) to Hedcor Hydro Project is very high acceptance when values and interest, engagement and participation, trust and confidence, information, and contextual are met and that the community will renew for another contract and give their consent for a new hydro project of Hedcor because of very high acceptance. Thus, the satisfaction of the Host Communities is very important in acquiring the consent of the Host Communities and the benefits to be shared from the power plant. Moreover, it is essential that the benefits taken from the project by the community are of equal value for the utilization of Hedcor to the natural resources of the host community.","abstract_source":"original","authors":["Bobby Atayan"],"date":"2023-03-22","doi":"10.5281/zenodo.7760428","id":1120,"issue":10,"journal":{"issn":"2822-4353","name":"Psychology and Education: A Multidisciplinary Journal"},"pdf_sha256":"105096caaf59dcf6b317e056b10b675ac2e32881b81e18d0b9a1a038167cd0ae","schema":"scimatic-article/1","title":"Validation and Determination of Level of Social Acceptability of Hydroelectric Power Plant Project of Hedcor Inc. in La Trinidad, Benguet","volume":7}

Check it yourself

1. The record, from the token's own metadata:

printf '%s' "$(curl -s https://scimatic.org/nft/articles/1120.json | jq -r .canonical_record)" | sha256sum

2. The hash stored on chain (contentHash(1120)):

curl -s https://rpc.scimatic.net -H 'content-type: application/json' \
  -d '{"jsonrpc":"2.0","id":1,"method":"eth_call","params":[{"to":"0x0E596B4bb924937aA35D9b342A90347ed6F05eF8","data":"0xf3e0c2900000000000000000000000000000000000000000000000000000000000000460"},"latest"]}'

The two must be equal (the second with a 0x in front).